Show simple item record

contributor authorAsim Karim
contributor authorHojjat Adeli
date accessioned2017-05-08T22:40:26Z
date available2017-05-08T22:40:26Z
date copyrightSeptember 1999
date issued1999
identifier other%28asce%290733-9364%281999%29125%3A5%28361%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85957
description abstractRecently, the writers developed a general and powerful mathematical model for scheduling construction projects. An optimization formulation was presented with the goal of minimizing the direct construction cost. The nonlinear optimization problem was solved by the recently patented neural dynamics model of Adeli and Park. In this paper an object-oriented (OO) information model is presented for construction scheduling, cost optimization, and change order management (CONSCOM) based on the new construction scheduling model. The goal is to lay the foundation for a new generation of flexible, powerful, maintainable, and reusable software system for the solution of construction scheduling problems. The model is presented as a domain-specific development framework using the Microsoft Foundation Class library and utilizing the software reuse feature of the framework. The framework reuse architecture is more flexible and powerful than other reuse techniques such as components and patterns. A companion paper presents the implementation of the OO information model in a prototype software system for management of construction projects, called CONSCOM.
publisherAmerican Society of Civil Engineers
titleOO Information Model for Construction Project Management
typeJournal Paper
journal volume125
journal issue5
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1999)125:5(361)
treeJournal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record