Show simple item record

contributor authorGang Mei
contributor authorAhsan Kareem
contributor authorJeffrey C. Kantor
date accessioned2017-05-08T22:40:22Z
date available2017-05-08T22:40:22Z
date copyrightApril 2004
date issued2004
identifier other%28asce%290733-9399%282004%29130%3A4%28459%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85907
description abstractIn this paper, a “third generation” benchmark problem that focuses on the control of wind excited response of a tall building, using the Model Predictive Control (MPC) scheme, is presented. A 76 story, 306 m tall concrete office tower proposed for the city of Melbourne, Australia, is being used to demonstrate the effectiveness of MPC. The MPC scheme is based on an explicit use of a prediction model of the system response to obtain the control actions by minimizing an objective function. Optimization objectives in MPC include minimization of the difference between the predicted and desired response trajectories, and the control effort subjected to prescribed constraints. By incorporating input/output hard constraints, the MPC scheme provides an optimal control force that satisfies the prescribed constraints.
publisherAmerican Society of Civil Engineers
titleModel Predictive Control of Wind-Excited Building: Benchmark Study
typeJournal Paper
journal volume130
journal issue4
journal titleJournal of Engineering Mechanics
identifier doi10.1061/(ASCE)0733-9399(2004)130:4(459)
treeJournal of Engineering Mechanics:;2004:;Volume ( 130 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record