Show simple item record

contributor authorSimon D. Smith
date accessioned2017-05-08T22:39:54Z
date available2017-05-08T22:39:54Z
date copyrightJune 1999
date issued1999
identifier other%28asce%290733-9364%281999%29125%3A3%28133%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85612
description abstractThe problem of accurate estimation of earthmoving productivity has intrigued many researchers for many years, but there is yet no model that will predict the output of such operations with a satisfactory degree of confidence for all situations. The problem is exacerbated by the occurrence of hauler bunching that results in many deterministic models overestimating productivity. Systems analysis methods can be used, such as queuing theory or simulation, but they are generally impractical to the average site planning engineer. This paper investigates the results obtained from over 140 separate earthmoving operations taken from four different highway construction projects. Initially, the effects of bunching are determined, and many factors that influence productivity are identified. To investigate the relationships between earthmoving operating conditions and both productivity and bunching, and to develop a deterministic model that will enable earthmoving operations to be planned for many different situations with relative ease, stepwise multiple regression techniques are used. The results indicate that there is a strong linear relationship between operating conditions and productivity.
publisherAmerican Society of Civil Engineers
titleEarthmoving Productivity Estimation Using Linear Regression Techniques
typeJournal Paper
journal volume125
journal issue3
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1999)125:3(133)
treeJournal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record