Show simple item record

contributor authorLuis F. Alarcón
contributor authorDavid B. Ashley
date accessioned2017-05-08T22:36:59Z
date available2017-05-08T22:36:59Z
date copyrightSeptember 1996
date issued1996
identifier other%28asce%290733-9364%281996%29122%3A3%28265%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/83912
description abstractThis paper presents a performance modeling methodology for application to individual projects. The model combines experience captured from experts with assessments from the project team. The methodology consists of a conceptual, qualitative-model structure and a mathematical-model structure. The conceptual-model structure, called the general performance model (GPM), is a simplified model of the variables and interaction that influence project performance. The mathematical model uses concepts of cross-impact analysis and probabilistic inference to capture the uncertainties and interactions among project variables. The GPM allows management to test different combinations of project-execution options and predict expected cost, schedule, and other performance impacts. The methodology provides a systematic and structured process for a project-team discussion on relevant planning issues in a project. Researchers should benefit from the exploratory and analytical capabilities of the methodology, as well as the flexible knowledge structure to update models and data. Computer implementation is also attractive as a means to disseminating research results.
publisherAmerican Society of Civil Engineers
titleModeling Project Performance for Decision Making
typeJournal Paper
journal volume122
journal issue3
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1996)122:3(265)
treeJournal of Construction Engineering and Management:;1996:;Volume ( 122 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record