description abstractProjects with repeating activities, such as multistory buildings and highways, present unique scheduling challenges. This paper presents the necessary requirements that scheduling systems should address to meet the needs and complexities of repetitive projects in practice. The repetitive scheduling method (RSM) provides a unified scheduling framework that applies to all types of repetitive projects. In RSM, projects are classified as discrete (vertical) or continuous (horizontal or linear) and then as uniform and nonuniform, depending on whether progress is measured using a counting scale or a dominant-attribute scale. RSM modeling elements include three types of activities (line, block, and bar) and 10 types of relationships (links) between activities.
publisherAmerican Society of Civil Engineers
titleRepetitive Scheduling Method: Requirements, Modeling, and Implementation
typeJournal Paper
journal volume142
journal issue5
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0001107
treeJournal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 005