Show simple item record

contributor authorDuc-Hoc Tran
contributor authorMin-Yuan Cheng
contributor authorMinh-Tu Cao
date accessioned2017-05-08T22:29:17Z
date available2017-05-08T22:29:17Z
date copyrightJuly 2016
date issued2016
identifier other46557306.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/81415
description abstractSolving resource-constrained (RC) project scheduling problems is one the most important tasks in the project planning process. This study presents a new hybrid approach, named Artificial Bee Colony with Differential Evolution, to handle resource-constrained problems (ABCDE-RC). The proposed algorithm integrates crossover operations from differential evolution (DE) with original artificial bee colony (ABC) to balance exploration and exploitation phases of the optimization process. Furthermore, this study applies a serial method to reflect individual-vector priorities into the active schedule to calculate project duration. The ABCDE-RC algorithm is compared with benchmark algorithms considered using a real construction case study and a set of standard problem available in the literature. The experimental results demonstrate the efficiency and effectiveness of the proposed model. The ABCDE-RC is a promising alternative approach to handling resource-constrained project scheduling problems.
publisherAmerican Society of Civil Engineers
titleSolving Resource-Constrained Project Scheduling Problems Using Hybrid Artificial Bee Colony with Differential Evolution
typeJournal Paper
journal volume30
journal issue4
journal titleJournal of Computing in Civil Engineering
identifier doi10.1061/(ASCE)CP.1943-5487.0000544
treeJournal of Computing in Civil Engineering:;2016:;Volume ( 030 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record