Show simple item record

contributor authorWalid Tizani
contributor authorTheodoros Pitrakkos
date accessioned2017-05-08T22:28:34Z
date available2017-05-08T22:28:34Z
date copyrightOctober 2015
date issued2015
identifier other46231804.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/81240
description abstractThis paper assesses the performance of a newly developed blind bolt, intended for use in constructing bolted moment-resisting connections to concrete-filled tubular steel profiles. A total of ten connection tests are reported, with each configuration having been subjected to a predominantly tensile force in a representation of the tension region of a typical moment connection. The test variables included type of fastener, addition of concrete to the tube, strength of the concrete, spacing among bolts, and bolt class. On the basis of deformability response, the benefits of filling the tubular member with concrete are highlighted. The favorable performance that results from using a relatively, high-grade concrete infill is also highlighted. The addition of a concrete infill to the tube stiffens and strengthens the otherwise relatively flexible tube walls, enhancing overall connection behavior in terms of stiffness, strength, and ductility. The performance of connections to concrete-filled tubular steel profiles using blind bolts with headed anchors is shown to be suitable for moment-resisting construction.
publisherAmerican Society of Civil Engineers
titlePerformance of T-Stub to CFT Joints Using Blind Bolts with Headed Anchors
typeJournal Paper
journal volume141
journal issue10
journal titleJournal of Structural Engineering
identifier doi10.1061/(ASCE)ST.1943-541X.0001169
treeJournal of Structural Engineering:;2015:;Volume ( 141 ):;issue: 010
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record