Show simple item record

contributor authorYongkui Li
contributor authorYujie Lu
contributor authorDongyu Li
contributor authorLiang Ma
date accessioned2017-05-08T22:26:43Z
date available2017-05-08T22:26:43Z
date copyrightDecember 2015
date issued2015
identifier other45266948.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/80745
description abstractEarly studies of project planning endorsed a task-centric method, such as the program evaluation and review technique (PERT), that assigns relationships and tasks based upon the logical sequences of construction. This method works for projects with clearly assigned tasks, specific requirements, finely tuned organizations, and explicit roles and responsibilities for the project team. However, for projects that exist in a fast-paced and complex environment and are performed by temporary organizations, this task-centric method neglects the interdependence between project tasks and project contextual factors, such as project organizations, teams, knowledge, and resources that have considerable effect on task completion and project effectiveness. To investigate the congruence, the matching degree, between task assignment and the project’s organizational environment, this study uses a three-dimensional metanetwork analysis (MNA) to model a project’s personnel [hereinafter referred to as agents (A)], knowledge (K), tasks (T), and all six interconnected networks: AA, AK, AT, KK, KT, and TT networks. MNA can identify incapable agents and overloaded tasks, which hinder the completion of tasks, and then it can optimize task assignment to achieve better project performance. Cross-case comparative studies of 11 Chinese automobile dealership construction projects were conducted in order to validate the proposed MNA model and optimization strategies. During the project optimization, three key network-level measures—the congruence of agent knowledge needs (
publisherAmerican Society of Civil Engineers
titleMetanetwork Analysis for Project Task Assignment
typeJournal Paper
journal volume141
journal issue12
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0001019
treeJournal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 012
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record