| description abstract | Simulation has played an important role in project-management studies of the last decades, but in order for them to produce practical results, a realistic distribution model for activity durations is indispensable. The construction industry often has needed historical records of project executions, to serve as inputs to the distribution models, but a clearly outlined calibration procedure is not always readily available, nor are their results readily interpretable. This study seeks to illustrate how data from the construction industry can be used to derive realistic input distributions. Therefore, the Parkinson simulation model with a lognormal core is applied to a large empirical dataset from the literature and the results are described. From a discussion of these results, an empirical classification of project executions is presented. Three possible uses are presented for the calibration procedure and the classification in project management simulation studies. These were validated using a case study of a construction company. | |
| publisher | American Society of Civil Engineers | |
| title | Empirical Perspective on Activity Durations for Project-Management Simulation Studies | |
| type | Journal Paper | |
| journal volume | 142 | |
| journal issue | 1 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)CO.1943-7862.0001022 | |
| tree | Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 001 | |
| contenttype | Fulltext | |