description abstractThis study analyzed the impact of change orders on construction projects by using the loss distribution approach (LDA), which is used in finance to analyze operational risks, and proposed a framework for applying the LDA to construction. It examined 9,028 change orders for 237 apartment housing projects in South Korea. Prior to the analysis, the change-order factors were classified into five categories and the work types into eight categories in order to form a risk matrix. The severity and frequency distributions of each cell were calculated based on the risk matrix. Because the amount of loss can vary depending on the construction cost,
publisherAmerican Society of Civil Engineers
titleLDA-Based Model for Measuring Impact of Change Orders in Apartment Projects and Its Application for Prerisk Assessment and Postevaluation
typeJournal Paper
journal volume141
journal issue7
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0000971
treeJournal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 007
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record