Show simple item record

contributor authorRobert C. Hilldale
contributor authorWayne O. Carpenter
contributor authorBradley Goodwiller
contributor authorJames P. Chambers
contributor authorTimothy J. Randle
date accessioned2017-05-08T22:21:28Z
date available2017-05-08T22:21:28Z
date copyrightMarch 2015
date issued2015
identifier other43036421.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/78582
description abstractIn 2008 and 2009, a series of bed load impact plates was installed across a channel spanning weir on the Elwha River, Washington. This is the first permanent installation of its kind in North America and one of the largest anywhere. The purpose of this system is to measure coarse bed load during and after the removal of Elwha and Glines Canyon Dams. It is estimated that
publisherAmerican Society of Civil Engineers
titleInstallation of Impact Plates to Continuously Measure Bed Load: Elwha River, Washington, USA
typeJournal Paper
journal volume141
journal issue3
journal titleJournal of Hydraulic Engineering
identifier doi10.1061/(ASCE)HY.1943-7900.0000975
treeJournal of Hydraulic Engineering:;2015:;Volume ( 141 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record