Show simple item record

contributor authorRui Zhang
contributor authorJianzhong Zhou
contributor authorHuifeng Zhang
contributor authorXiang Liao
contributor authorXuemin Wang
date accessioned2017-05-08T22:16:25Z
date available2017-05-08T22:16:25Z
date copyrightApril 2014
date issued2014
identifier other40051409.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/75825
description abstractIn recent decades, there has been a rapid rate of development of hydropower in China. The unprecedented rate of expansion, development scale, and large numbers of hydropower plants have posed a challenge to the operation of large-scale cascaded hydropower systems (OLCHSs), which has become one of the most important factors in ensuring the security and economic operation of the power grid in China. In this paper, a long-term optimal operation model is developed for the purpose of maximizing the total generated energy of cascaded hydropower plants. To solve the OLCHS problem effectively, an elite-guide particle swarm optimization (EGPSO) algorithm is proposed in this paper. An external archive set, which can preserve elite solutions during the evolution process, is employed to provide flying directions for particles. Since the OLCHS problem is a high-dimensional, nonlinear, multistage, and stringent constraint optimal problem, the proposed algorithm introduces three new innovations: a layer-partition approach is presented to divide the decision vectors into small ones according to the reservoir’s relative position and hydraulic connection. Meanwhile, the initial solutions are generated in the proposed contractively feasible region so that operation results do not rely so much on the initial solution. To deal with the multiconstraint coupling problem, a constraint-corridor method is adapted to handle these complex constraints in the cascaded hydropower system. Finally, this novel strategy is applied successfully to solve the optimal operation of a large-scaled cascaded hydropower system in the upper reaches of the Yangtze River. Compared with the conventional method, the proposed EGPSO has a competitive performance in not only simulation results but also computing time, which offers a new approach to solving high-dimensional and complicated problems of optimizing reservoir dispatching.
publisherAmerican Society of Civil Engineers
titleOptimal Operation of Large-Scale Cascaded Hydropower Systems in the Upper Reaches of the Yangtze River, China
typeJournal Paper
journal volume140
journal issue4
journal titleJournal of Water Resources Planning and Management
identifier doi10.1061/(ASCE)WR.1943-5452.0000337
treeJournal of Water Resources Planning and Management:;2014:;Volume ( 140 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record