Show simple item record

contributor authorHu
contributor authorJianhua
contributor authorShen
contributor authorRuili
date accessioned2017-05-08T22:15:10Z
date available2017-05-08T22:15:10Z
date copyrightSeptember 2014
date issued2014
identifier other39999527.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/75229
description abstractThe recently completed Aizhai Bridge in the west of Hunan Province in China is a long-span suspension bridge across a deep canyon. In view of the particular problems posed by the surrounding landscape and geologic conditions, and to minimize the impact of the bridge on the natural environment, a novel pylon-girder detached suspension structure was adopted, in which there is a large difference in the span between the main cable and the stiffening girder. As part of the design process, a method for stability analysis of the combined system of pylon, anchorage, tunnel, and rock cliff was developed. In addition, to solve the problems involved in the transportation and erection of the stiffening girder of such a long-span suspension bridge in a mountainous area, a novel girder-conveying track cable method was developed.
publisherAmerican Society of Civil Engineers
titleTechnical Innovations of the Aizhai Bridge in China
typeJournal Paper
journal volume19
journal issue9
journal titleJournal of Bridge Engineering
identifier doi10.1061/(ASCE)BE.1943-5592.0000599
treeJournal of Bridge Engineering:;2014:;Volume ( 019 ):;issue: 009
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record