Show simple item record

contributor authorYi Liu
contributor authorGuoxin Zhang
contributor authorBofang Zhu
contributor authorFeng Shang
date accessioned2017-05-08T22:10:58Z
date available2017-05-08T22:10:58Z
date copyrightApril 2016
date issued2016
identifier other37434102.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/72992
description abstractChina is addressing the significant challenge posed by the construction of several 300-m-high arch dams for the effective use of hydropower resources. Limited experience has been gained globally in the construction of super-high arch dams. Moreover, the present design codes are based on past experiences with arch dams with significantly lower height. Stress computation consists of many analytical simplifications. In addition, numerous questions may be raised regarding the reliability of this computation for application to super-high arch dams. This study therefore presents an integrated analytical approach to simulate the actual working performance of super-high arch dams. This approach emphasizes the significance of the analytical descriptions on four actual factors: (1) actual material, (2) actual structure, (3) actual load, and (4) actual process. Furthermore, the effectiveness of the actual working performance simulation has been proven by updated engineering practice.
publisherAmerican Society of Civil Engineers
titleActual Working Performance Assessment of Super-High Arch Dams
typeJournal Paper
journal volume30
journal issue2
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)CF.1943-5509.0000745
treeJournal of Performance of Constructed Facilities:;2016:;Volume ( 030 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record