description abstractThis is a summary of the quality performance efforts on project 12, a heavy industrial project with a total installed cost in excess of $100,000,000. Quality performance efforts are tracked using the quality performance management system (QPMS). QPMS tracks labor costs in three main categories: normal work, quality management work (prevention and appraisal), and rework (deviation correction). The cost of quality is the sum of quality management and rework. The system is implemented by all parties (the owner, the two designers, and the constructor) at the beginning of the design phase and continued through construction phase to mechanical completion. The overall cost of quality, less owner changes of 0.2%, for project 12 is 11.2% of the total labor expenditures, design plus construction. Quality management totals 8.1% and rework is 3.1%. QPMS is found to promote awareness and improve the understanding of the quality process, facilitate communication, focus management on where quality improvements could be made, and reduce the overall cost of quality. Data are generated to benchmark quality performance on future projects.
publisherAmerican Society of Civil Engineers
titleQuality Performance on Successful Project
typeJournal Paper
journal volume120
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1994)120:1(34)
treeJournal of Construction Engineering and Management:;1994:;Volume ( 120 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record