Show simple item record

contributor authorByung-Cheol Kim
date accessioned2017-05-08T22:06:50Z
date available2017-05-08T22:06:50Z
date copyrightSeptember 2015
date issued2015
identifier other28941876.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/71611
description abstractEarned value management (EVM) facilitates practicing management-by-exception by triggering control actions only when they are needed. The efficiency and effectiveness of project control actions are influenced by the control thresholds used to identify meaningful performance deviations or trends from the plan. This paper presents a quantitative method for establishing dynamic control thresholds (DCTs) that change at different percent completion points according to the degree of achievability of the project objectives in time and money. The DCTs in this paper overcome two limitations of conventional fixed control thresholds. First, the DCTs provide consistent measures of risk and early warning signals for different EVM performance measurements and forecasts. Second, the DCTs provide additional information to detect false warnings from deterministic performance analysis and forecasting monitored by fixed control thresholds, especially early in a project. This paper mainly focuses on schedule performance and addresses cost performance application as an extension.
publisherAmerican Society of Civil Engineers
titleDynamic Control Thresholds for Consistent Earned Value Analysis and Reliable Early Warning
typeJournal Paper
journal volume31
journal issue5
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0000309
treeJournal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record