Show simple item record

contributor authorJiawu Miao
contributor authorMinshan Pei
contributor authorXigang Zhang
contributor authorRucheng Xiao
date accessioned2017-05-08T22:04:50Z
date available2017-05-08T22:04:50Z
date copyrightDecember 2006
date issued2006
identifier otherjhtrcq%2E0000143.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/70694
description abstractThe SuTong cable-stayed bridge is the Primary Fairway Bridge of the Suzhou-Nantong Yangtze River Bridge Project. It will be the most important project with significant target to diminish the economy gap and promote balanced development between Suzhou and Nantong city in China. The total length of the cable-stayed portion of this project is 2,088 m with main span of 1,088 m. The height of the pylons is about 300 m. When completed it will be the longest cable-stayed bridge in the world. This paper gives a brief description of the bridge and some considerations on structural design and static analysis.
publisherAmerican Society of Civil Engineers
titleGlobal Analysis of the SuTong Cable-stayed Bridge
typeJournal Paper
journal volume1
journal issue1
journal titleJournal of Highway and Transportation Research and Development (English Edition)
identifier doi10.1061/JHTRCQ.0000143
treeJournal of Highway and Transportation Research and Development (English Edition):;2006:;Volume ( 001 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record