Show simple item record

contributor authorYe Fei
contributor authorZhu Hehua
contributor authorDing Wenqi
date accessioned2017-05-08T22:04:42Z
date available2017-05-08T22:04:42Z
date copyrightMarch 2011
date issued2011
identifier otherjhtrcq%2E0000042.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/70583
description abstractThe upward-moving of shield tunnel during construction has brought about great concern. The reasons of shield tunnel upward-moving were analyzed and classified into six aspects, including buoyancy, axial eccentric force, slurry pressure, foundation rebound, compression of covering soil, and the sand liquescence. The upward moving of shield tunnel brought by buoyancy was discussed with emphasis. Two kinds of calculation models of anti-upward moving were presented considering the transverse and longitudinal characteristics of shield tunnel, which were called partial anti-upward moving model and whole anti-upward moving model respectively. According to the characteristics and affecting area of the buoyancy, the partial anti-upward moving model was divided into single segment analytic model and whole segment ring analytic model. The similarities and differences of settlement and upward-moving were compared in the whole anti-upward moving model, which manifested the coherence of the settlement and upward-moving of shield tunnel. The adaptability of the presented models was also discussed.
publisherAmerican Society of Civil Engineers
titleAnalysis of Calculation Models of Anti-upward Moving for Shield Tunnel and Their Adaptability
typeJournal Paper
journal volume5
journal issue1
journal titleJournal of Highway and Transportation Research and Development (English Edition)
identifier doi10.1061/JHTRCQ.0000042
treeJournal of Highway and Transportation Research and Development (English Edition):;2011:;Volume ( 005 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record