Show simple item record

contributor authorThomas P. O’Connor
contributor authorJames Rossi
date accessioned2017-05-08T22:02:18Z
date available2017-05-08T22:02:18Z
date copyrightNovember 2009
date issued2009
identifier other%28asce%290733-9372%282009%29135%3A11%281145%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/69486
description abstractThe U.S. Environmental Protection Agency’s (USEPA) Urban Watershed Management Branch monitored a best management practice (BMP) wetland in the Richmond Creek (RC) watershed. This BMP, designated Richmond Creek #5 (RC-5), is owned and operated by the New York City Department of Environmental Protection’s as part of the Bluebelt program. During monitoring performed in 2003 and 2004, RC-5 was monitored for several water quality parameters including suspended solids (SS), chemical oxygen demand (COD), and phosphorous. Calculated SS loads demonstrated a 61% removal which is in line with the anticipated removals of 55%–57%, however, COD was not being removed from RC-5. Due to visible accumulation of sediment in the forebay and leaves throughout the BMP, maintenance activity was performed in the spring of 2005, to remove the sediment and organic matter (leaves) by vactor truck and physical labor. About four truck loads of sediment and leaf litter, estimated at
publisherAmerican Society of Civil Engineers
titleMonitoring of a Best Management Practice Wetland before and after Maintenance
typeJournal Paper
journal volume135
journal issue11
journal titleJournal of Environmental Engineering
identifier doi10.1061/(ASCE)0733-9372(2009)135:11(1145)
treeJournal of Environmental Engineering:;2009:;Volume ( 135 ):;issue: 011
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record