Show simple item record

contributor authorCecília Vale
contributor authorIsabel M. Ribeiro
contributor authorRui Calçada
date accessioned2017-05-08T22:01:58Z
date available2017-05-08T22:01:58Z
date copyrightJanuary 2012
date issued2012
identifier other%28asce%29te%2E1943-5436%2E0000339.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/69301
description abstractIn the area with railway engineering, scheduling preventive maintenance actions is an important issue for engineers and railway administrations because the optimization of maintenance actions at a preventive level allows maintenance costs to be reduced during the life cycle of the track, with the guarantee of its geometrical quality. This paper describes a model designed to optimize the tamping operations in ballasted tracks as preventive maintenance. The model, formulated as mixed 0–1 linear program, considers real technical aspects as constraints, which is a novel approach in the optimization of track maintenance over time. Global optimization is used to predict and to schedule tamping, taking into account four aspects: the evolution of the track degradation over time; the track layout; the dependency of the track quality recovery on the track quality at the moment of the maintenance operation; the track quality limits that depend on the maximum permissible train speed. Computational experience with two track stretches of the Portuguese Northern Railway Line is included to highlight the efficacy of the proposed methodology.
publisherAmerican Society of Civil Engineers
titleInteger Programming to Optimize Tamping in Railway Tracks as Preventive Maintenance
typeJournal Paper
journal volume138
journal issue1
journal titleJournal of Transportation Engineering, Part A: Systems
identifier doi10.1061/(ASCE)TE.1943-5436.0000296
treeJournal of Transportation Engineering, Part A: Systems:;2012:;Volume ( 138 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record