| description abstract | Risk control in project management has been receiving increasing attention in recent years. This paper proposes an approach based on a risk-assessment program and demonstrates how this can be extended to enhance the multimode resource-constrained project-scheduling problem (MRCPSP) to realize risk control and effective scheduling. The main contribution of this paper is to provide a means to control scheduling and material-purchasing risks by using a bilevel decision framework to identify risk and conduct a focused evaluation. Specifically, this paper establishes a hybrid uncertain multiobjective bilevel programming model and introduces an expected-value operator to deal with the hybrid uncertainty. A multiswarm differential-updating particle swarm optimization is developed to support the model calculations. Worthiness and efficiency of the proposed approach is validated using a case study. This approach can help improve scheduling strategies and ensure realistic project-planning. | |
| publisher | American Society of Civil Engineers | |
| title | Control Risk for Multimode Resource-Constrained Project Scheduling Problems under Hybrid Uncertainty | |
| type | Journal Paper | |
| journal volume | 31 | |
| journal issue | 3 | |
| journal title | Journal of Management in Engineering | |
| identifier doi | 10.1061/(ASCE)ME.1943-5479.0000243 | |
| tree | Journal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 003 | |
| contenttype | Fulltext | |