description abstractRisk control in project management has been receiving increasing attention in recent years. This paper proposes an approach based on a risk-assessment program and demonstrates how this can be extended to enhance the multimode resource-constrained project-scheduling problem (MRCPSP) to realize risk control and effective scheduling. The main contribution of this paper is to provide a means to control scheduling and material-purchasing risks by using a bilevel decision framework to identify risk and conduct a focused evaluation. Specifically, this paper establishes a hybrid uncertain multiobjective bilevel programming model and introduces an expected-value operator to deal with the hybrid uncertainty. A multiswarm differential-updating particle swarm optimization is developed to support the model calculations. Worthiness and efficiency of the proposed approach is validated using a case study. This approach can help improve scheduling strategies and ensure realistic project-planning.
publisherAmerican Society of Civil Engineers
titleControl Risk for Multimode Resource-Constrained Project Scheduling Problems under Hybrid Uncertainty
typeJournal Paper
journal volume31
journal issue3
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0000243
treeJournal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record