contributor author | Lu Gan | |
contributor author | Jiuping Xu | |
date accessioned | 2017-05-08T21:54:56Z | |
date available | 2017-05-08T21:54:56Z | |
date copyright | May 2015 | |
date issued | 2015 | |
identifier other | %28asce%29me%2E1943-5479%2E0000277.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/66299 | |
description abstract | Risk control in project management has been receiving increasing attention in recent years. This paper proposes an approach based on a risk-assessment program and demonstrates how this can be extended to enhance the multimode resource-constrained project-scheduling problem (MRCPSP) to realize risk control and effective scheduling. The main contribution of this paper is to provide a means to control scheduling and material-purchasing risks by using a bilevel decision framework to identify risk and conduct a focused evaluation. Specifically, this paper establishes a hybrid uncertain multiobjective bilevel programming model and introduces an expected-value operator to deal with the hybrid uncertainty. A multiswarm differential-updating particle swarm optimization is developed to support the model calculations. Worthiness and efficiency of the proposed approach is validated using a case study. This approach can help improve scheduling strategies and ensure realistic project-planning. | |
publisher | American Society of Civil Engineers | |
title | Control Risk for Multimode Resource-Constrained Project Scheduling Problems under Hybrid Uncertainty | |
type | Journal Paper | |
journal volume | 31 | |
journal issue | 3 | |
journal title | Journal of Management in Engineering | |
identifier doi | 10.1061/(ASCE)ME.1943-5479.0000243 | |
tree | Journal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 003 | |
contenttype | Fulltext | |