description abstractThis article investigates the factors and corresponding subfactors affecting the length of the concession period for a build-operate-transfer (BOT) tunnel project. It includes five steps, namely, identifying the influential factors of concession period length determination, identifying the subinfluential factors, quantification of the factors, variable ranking, and variable testing. The influential factors and subfactors were identified through an extensive review of literature and a questionnaire survey. Qualitative factors were then quantified and all the factors were scaled and ranked by the entropy method, and finally tested by a support vector machine-based prediction model. In the end, a set of key influential factors of concession period length was developed. It is expected that the developed factors can improve the accuracy and effectiveness of concession period length determination.
publisherAmerican Society of Civil Engineers
titleFactors That Influence the Concession Period Length for Tunnel Projects under BOT Contracts
typeJournal Paper
journal volume30
journal issue1
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0000180
treeJournal of Management in Engineering:;2014:;Volume ( 030 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record