description abstractConstruction delays are common in construction industry and create major concerns for project performance. Construction delays are caused by many factors. The aim of this paper is to identify delay factors on construction projects and analyze these factors with the relative importance index method. For this purpose, 83 different delay factors were identified, categorized into nine major groups, and visualized by the Ishikawa (fishbone) diagram through detailed literature review and interviews with experts from the construction industry. The relative importances of these delay factors were quantified by the relative importance index method. The ranking of the factors and groups were demonstrated according to their importance level on delay. According to the case study results, the factors and groups contributing the most to delays (those needing attention) were discussed, and some recommendations were made to minimize and control delays in construction projects.
publisherAmerican Society of Civil Engineers
titleQuantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey
typeJournal Paper
journal volume29
journal issue2
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0000129
treeJournal of Management in Engineering:;2013:;Volume ( 029 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record