Show simple item record

contributor authorEsther Cheung
contributor authorAlbert P. C. Chan
date accessioned2017-05-08T21:54:29Z
date available2017-05-08T21:54:29Z
date copyrightApril 2011
date issued2011
identifier other%28asce%29me%2E1943-5479%2E0000076.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/66103
description abstractThis paper presents an evaluation model useful for assessing the suitability of public-private partnership (PPP) projects by studying their attractive and negative factors. A survey of industrial practitioners in Hong Kong was conducted. Respondents were asked to rank the importance of 15 attractive and 13 negative factors for adopting PPP. From the rankings, relative weights of each factor were derived. The weights of these factors formed the basis for the evaluation model presented in this paper. The Hong Kong Zhuhai Macau Bridge was used to demonstrate how this evaluation model could be applied. From the list of attractive and negative factors the writers selected those that were foreseeable in this project. Calculating the total weights of each group of factors showed that negative factors outweighed attractive factors by 27%. The result indicated that PPP would not be a suitable method for delivering this project. The evaluation model presented in this paper can help both the public and private sectors to assess whether potential public projects are suited for PPP.
publisherAmerican Society of Civil Engineers
titleEvaluation Model for Assessing the Suitability of Public-Private Partnership Projects
typeJournal Paper
journal volume27
journal issue2
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0000044
treeJournal of Management in Engineering:;2011:;Volume ( 027 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record