Show simple item record

contributor authorJames H. Paek
contributor authorYong W. Lee
contributor authorThomas R. Napier
date accessioned2017-05-08T21:41:48Z
date available2017-05-08T21:41:48Z
date copyrightJune 1992
date issued1992
identifier other%28asce%290733-9364%281992%29118%3A2%28303%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/59730
description abstractWith the cost of construction to replace deteriorated facilities estimated in the billions of dollars, the Department of Defense is seeking ways of reducing both the time and money spent to provide the high‐quality structures needed to support the military mission. Design/build procurement approaches have been proposed as alternatives to the traditional design/bid/build method. The successful selection process for choosing a design/build proposal is based on a high degree of technical factors and a low construction cost. However, the objectives of maximizing the degree of technical factors and minimizing the cost are in conflict, and the evaluation of the technical factors and cost is associated with the uncertainty. In this study, a multicriterion decision‐making methodology using a fuzzy‐logic system is provided to assist decision makers in selecting the winning design/build proposal that best satisfies the requirement of technical factors and the cost reduction. An example application of the proposed evaluation methodology to an actual project is provided.
publisherAmerican Society of Civil Engineers
titleSelection of Design/Build Proposal Using Fuzzy‐Logic System
typeJournal Paper
journal volume118
journal issue2
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1992)118:2(303)
treeJournal of Construction Engineering and Management:;1992:;Volume ( 118 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record