Show simple item record

contributor authorDaegu Cho
contributor authorJeffrey S. Russell
contributor authorJongsoo Choi
date accessioned2017-05-08T21:40:42Z
date available2017-05-08T21:40:42Z
date copyrightNovember 2013
date issued2013
identifier other%28asce%29cp%2E1943-5487%2E0000249.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/59222
description abstractCost, schedule, and performance control are three major functions in the project execution phase. Along with their individual importance, cost-schedule integration has been a major challenge over the past five decades in the construction industry. While much effort has been exerted to propose an ideal integration system, a distributed approach has prevailed. Consequently, cost-schedule integration has remained an unsolved problem. The primary purpose of this paper is to propose a new approach to integrate cost, schedule, and performance data. This paper concentrates on project execution data related to project control functions including quantity takeoffs, cost estimation, cost control, schedule control, periodic monthly payment, and performance measurement. The terms for an ideal integration are analyzed, and a construction information database framework (CIDF) is proposed that supports multiple perspectives and levels of detail with a relatively small number of control accounts.
publisherAmerican Society of Civil Engineers
titleDatabase Framework for Cost, Schedule, and Performance Data Integration
typeJournal Paper
journal volume27
journal issue6
journal titleJournal of Computing in Civil Engineering
identifier doi10.1061/(ASCE)CP.1943-5487.0000241
treeJournal of Computing in Civil Engineering:;2013:;Volume ( 027 ):;issue: 006
contenttypeFulltext