Show simple item record

contributor authorE. William East
contributor authorNicholas Nisbet
contributor authorThomas Liebich
date accessioned2017-05-08T21:40:34Z
date available2017-05-08T21:40:34Z
date copyrightJanuary 2013
date issued2013
identifier other%28asce%29cp%2E1943-5487%2E0000203.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/59173
description abstractCurrent specifications for facility handover information require contractors to produce and deliver a set of documents that provide little practical value to the facility manager. Facility managers begin their duties by rekeying the information found in these handover documents. This paper describes the facility management handover (FM) model view definition (MVD), an open-standard information exchange format that may replace current construction handover document requirements. The work was accomplished in conjunction with three buildingSMART chapters to ensure the widest possible international acceptance. The specification of the underlying industry foundation class (IFC) model with required business rules for use in the United States is called the construction-operations building information exchange (COBie) format. Procedures used to test software production and consumption of COBie were developed. Use of COBie has now been documented in several case studies.
publisherAmerican Society of Civil Engineers
titleFacility Management Handover Model View
typeJournal Paper
journal volume27
journal issue1
journal titleJournal of Computing in Civil Engineering
identifier doi10.1061/(ASCE)CP.1943-5487.0000196
treeJournal of Computing in Civil Engineering:;2013:;Volume ( 027 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record