Show simple item record

contributor authorReza Dehghan
contributor authorJanaka Y. Ruwnapura
date accessioned2017-05-08T21:40:11Z
date available2017-05-08T21:40:11Z
date copyrightFebruary 2014
date issued2014
identifier other%28asce%29co%2E1943-7862%2E0000794.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58945
description abstractAn effective and well-known technique for earlier completion of construction projects is to overlap the project activities that normally would be performed in sequence. Overlapping, often called fast-tracking, is inherently risky because it increases uncertainties and can result in more changes and rework. In order to gain maximum advantages from early project completion, a trade-off between benefits and losses of activity overlapping is required. In this paper, a new model has been developed to (1) explain in detail the mechanism and characteristics of design activity overlapping and (2) formulate and discuss design activity overlapping time-cost trade-off. A qualitative research methodology including interviews and focus groups with experts was used to generate and refine the model. This model contributes to the body of knowledge of construction management by demonstrating (1) how to analyze multipath networks through introducing the multi-predecessor effect and (2) how to analyze concurrent overlapping through introducing the cascade effect. The results of this paper can generate insights for further research to solve the overlapping time-cost trade-off and determine the optimum overlapping degree.
publisherAmerican Society of Civil Engineers
titleModel of Trade-Off between Overlapping and Rework of Design Activities
typeJournal Paper
journal volume140
journal issue2
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0000786
treeJournal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record