Show simple item record

contributor authorHeng Jiang
contributor authorYouquan Xu
contributor authorChunlu Liu
date accessioned2017-05-08T21:40:01Z
date available2017-05-08T21:40:01Z
date copyrightNovember 2013
date issued2013
identifier other%28asce%29co%2E1943-7862%2E0000736.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58885
description abstractReliable prediction of construction prices is essential for the construction industry because price variation can affect the decisions of construction contractors, property investors, and related financial institutions. Various modeling and prediction techniques for construction prices have been studied, but few researchers have considered the impact of global economic events and the seasonality of construction prices. In this study, global economic events and construction price seasonality as intervention dummies, together with a group of macroeconomic variables, are considered in a vector error correction (VEC) model to accurately predict the movement of construction prices. The proposed prediction model is verified against a series of diagnostic statistical criteria and compared with conventional VEC, multiregression, and Box-Jenkins approaches. Results indicate that the VEC model with dummy variables is more effective and reliable for forecasting construction prices. The VEC model with dummy variables can also assist construction economists to analyze the effect of special events and factors on the construction industry.
publisherAmerican Society of Civil Engineers
titleConstruction Price Prediction Using Vector Error Correction Models
typeJournal Paper
journal volume139
journal issue11
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0000729
treeJournal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 011
contenttypeFulltext