contributor author | Gregory A. Duffy | |
contributor author | Garold D. Oberlender | |
contributor author | David Hyung Seok Jeong | |
date accessioned | 2017-05-08T21:39:21Z | |
date available | 2017-05-08T21:39:21Z | |
date copyright | August 2011 | |
date issued | 2011 | |
identifier other | %28asce%29co%2E1943-7862%2E0000326.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/58478 | |
description abstract | Activity production rates drive the development and accuracy of linear schedules. The nature of linear projects dictates an assortment of variables that affect each activity’s production rate. The purpose of this research was to expand the capabilities of linear scheduling to account for variance in production rates when and where the variance occurs and to enhance the visual capabilities of linear scheduling. This new linear scheduling model, a linear scheduling model with varying production rates ( | |
publisher | American Society of Civil Engineers | |
title | Linear Scheduling Model with Varying Production Rates | |
type | Journal Paper | |
journal volume | 137 | |
journal issue | 8 | |
journal title | Journal of Construction Engineering and Management | |
identifier doi | 10.1061/(ASCE)CO.1943-7862.0000320 | |
tree | Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 008 | |
contenttype | Fulltext | |