Show simple item record

contributor authorAhmed Senouci
contributor authorKhaled El-Rayes
date accessioned2017-05-08T21:38:55Z
date available2017-05-08T21:38:55Z
date copyrightAugust 2009
date issued2009
identifier other%28asce%29co%2E1943-7862%2E0000052.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58190
description abstractThis paper presents a multiobjective optimization model that provides new and unique capabilities including generating and evaluating optimal/near-optimal construction resource utilization and scheduling plans that simultaneously minimize the time and maximize the profit of construction projects. The computations in the present model are organized in three major modules: (1) a scheduling module that develops practical schedules for construction projects; (2) a profit module that computes the project profit; and (3) a multiobjective module that searches for and identifies optimal/near optimal trade-offs between project time and profit. A large-scale construction project is analyzed to illustrate the use of the model and to demonstrate its capabilities in generating and visualizing optimal trade-offs between construction time and profit.
publisherAmerican Society of Civil Engineers
titleTime-Profit Trade-Off Analysis for Construction Projects
typeJournal Paper
journal volume135
journal issue8
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0000031
treeJournal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 008
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record