Show simple item record

contributor authorPatrick T. I. Lam
contributor authorArshad Ali Javed
date accessioned2017-05-08T21:38:48Z
date available2017-05-08T21:38:48Z
date copyrightApril 2015
date issued2015
identifier other%28asce%29cf%2E1943-5509%2E0000559.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/58147
description abstractAn output specification is an integral part of the contract documentation for procuring and monitoring public private partnership (PPP) or private finance initiative (PFI) projects throughout their life cycles. Unlike prescriptive specifications used in the traditional project delivery, the output specifications stipulate what is required from the project rather than how they should be delivered by the private sector. Performance standards or output parameters are used for bid evaluation and operational monitoring. Failure to achieve them would lead to ongoing payment deduction and rectifications that need to be undertaken within a specified time frame. The long concession periods of PPP/PFI projects mean that changes are inevitable, and these, if foreseeable, should be managed using the output specification as a tool. This unconventional approach of specifying requires special skills and care. This paper presents the results of a questionnaire survey conducted in Australia and the U.K. with PPP/PFI practitioners. The findings highlight the common pitfalls and change management issues encountered by the two jurisdictions, which use PPP or PFI extensively in delivering public assets and services. While common pitfalls include conflicts between input and output specifications, and performance standards being compromised with affordability, small changes are often made by the public sector authorities. Changes are dealt with by anticipatory provisions in output specifications, or negotiations as and when they arise. Procedural hiccups may slow down the process of introducing necessary changes, or give rise to disputes.
publisherAmerican Society of Civil Engineers
titleComparative Study on the Use of Output Specifications for Australian and U.K. PPP/PFI Projects
typeJournal Paper
journal volume29
journal issue2
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)CF.1943-5509.0000554
treeJournal of Performance of Constructed Facilities:;2015:;Volume ( 029 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record