Show simple item record

contributor authorDeborah J. Fisher
contributor authorJames T. O'Connor
date accessioned2017-05-08T21:30:33Z
date available2017-05-08T21:30:33Z
date copyrightSeptember 1991
date issued1991
identifier other%28asce%290733-9364%281991%29117%3A3%28468%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/54175
description abstractThis paper focuses on how the productivity of semi‐automated piping construction for process plants may be improved through constructability‐enhancement tactics. This paper answers the question regarding how field operations activities must be altered to support the automated field effort. The semi‐automated environment of piping erection assumes a pipe manipulator attached to the boom of a 22‐ton, rough‐terrain crane for the base piece of pipe‐lifting equipment. This study concentrates on horizontal process piping erection. Three major categories of constructability issues are addressed. These issues include material handling, equipment capabilities, and equipment configuration. Quantitative techniques used to compile empirical data regarding innovations for a semi‐automated construction process include physical modeling and computer simulation, via a three‐dimensional computed‐aided design simulation software package. There is a 24% construction‐productivity savings occurring when these constructability issues for the automated piping erection system are implemented.
publisherAmerican Society of Civil Engineers
titleConstructability for Piping Automation: Field Operations
typeJournal Paper
journal volume117
journal issue3
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1991)117:3(468)
treeJournal of Construction Engineering and Management:;1991:;Volume ( 117 ):;issue: 003
contenttypeFulltext