Show simple item record

contributor authorQizhong Guo
contributor authorGeorge P. Lordi
date accessioned2017-05-08T21:30:22Z
date available2017-05-08T21:30:22Z
date copyrightJuly 2000
date issued2000
identifier other%28asce%290733-9372%282000%29126%3A7%28675%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/54053
description abstractA method is developed to quantify total freshwater input and flushing time in estuaries using measured flow and salinity data at the estuary-ocean boundary. A formula is derived to calculate the volume of mixed estuarine water that leaves the estuary on the ebb tide. The calculated volume of mixed estuarine water, along with the volume of new ocean water that enters the estuary on the flood tide, is used to quantify the total volume of freshwater input. The calculated volume of mixed estuarine water is also used to quantify the flushing time. The developed method is applied to Barnegat Bay, N.J. The volume of freshwater input calculated from the new method compares well with that estimated using watershed, aquifer, and meteorological data. The flushing time calculated from the new method is between that calculated from the classical tidal prism method and that from the fraction of freshwater method. An assessment is made on the sensitivity of calculated values to the quality of measured data at the estuary-ocean boundary. The volume of freshwater input and the flushing time calculated from the developed method are highly reliable when there is a significant salinity difference between flood and ebb tides.
publisherAmerican Society of Civil Engineers
titleMethod for Quantifying Freshwater Input and Flushing Time in Estuaries
typeJournal Paper
journal volume126
journal issue7
journal titleJournal of Environmental Engineering
identifier doi10.1061/(ASCE)0733-9372(2000)126:7(675)
treeJournal of Environmental Engineering:;2000:;Volume ( 126 ):;issue: 007
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record