Show simple item record

contributor authorZhong Liu
contributor authorFang Li
contributor authorW. M. Kim Roddis
date accessioned2017-05-08T21:24:59Z
date available2017-05-08T21:24:59Z
date copyrightJanuary 2002
date issued2002
identifier other%28asce%291084-0702%282002%297%3A1%2814%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/50602
description abstractAn innovative self-shoring staged construction method was developed to build the world’s longest reinforced composite concrete arch bridge across the Yangtze River at Wanxian, in Chongqing, China. The method uses a steel tube truss frame constructed by the conventional cantilever launching technique. This steel frame with concrete-filled tubes performs the dual role of arch falsework and arch main reinforcement for the final reinforced concrete arch bridge. An optimized schedule for concrete placement was proposed to control the stresses, deflections, and stability of the arch rib during construction. The time dependent effects of concrete, the nonlinear stress-strain relationship of steel and concrete, as well as the geometric nonlinearility were considered. Control information at various stages of construction can be provided using the model developed. A program was developed to conduct parametric studies for selection of the final construction scheme and to direct the construction progress by monitoring and comparing actual and predicted stress and deflection.
publisherAmerican Society of Civil Engineers
titleAnalytic Model of Long-Span Self-Shored Arch Bridge
typeJournal Paper
journal volume7
journal issue1
journal titleJournal of Bridge Engineering
identifier doi10.1061/(ASCE)1084-0702(2002)7:1(14)
treeJournal of Bridge Engineering:;2002:;Volume ( 007 ):;issue: 001
contenttypeFulltext