Show simple item record

contributor authorCourtland R. Perry
contributor authorCliff J. Schexnayder
contributor authorKraig Knutson
date accessioned2017-05-08T21:22:46Z
date available2017-05-08T21:22:46Z
date copyrightNovember 2004
date issued2004
identifier other%28asce%291084-0680%282004%299%3A4%28216%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/49154
description abstractThe village of Cookville, Vermont, has a well-preserved and well-defined historic district and an 80-year-old bridge that served to link the historic district to the village center. In 1997, that old bridge needed to be replaced. The new bridge located in Corinth, Vermont, is a graceful blend of aesthetics and function; the bridge is a substantial departure from typical precast or cast-in-place concrete bridges. The construction of this bridge combined the use of standard construction practices with the use of a special forming method and a unique concrete staining process to create special aesthetic concrete surfaces. The final result was a bridge that appears as if it was built by a stonemason, using stones from the brook that runs underneath it.
publisherAmerican Society of Civil Engineers
titleConstructing a Scenic Bridge
typeJournal Paper
journal volume9
journal issue4
journal titlePractice Periodical on Structural Design and Construction
identifier doi10.1061/(ASCE)1084-0680(2004)9:4(216)
treePractice Periodical on Structural Design and Construction:;2004:;Volume ( 009 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record