description abstractThree years ago research was conducted regarding total quality management (TQM) implementations in engineering and construction companies. This paper presents the second snapshot of the status of the TQM implementations in these companies. The same TQM implementation survey that was used in the initial study was sent to the same six firms—only three years later. This work shows the progress of the TQM implementations, identifies the changes in the perceptions of the six firms toward TQM, and analyzes the correlations established in the initial study This second survey provided another node of data, through which several trends and similarities were discovered and documented. The second survey found that the overall motivating reasons for implementing TQM remained essentially the same, and that most firms still believed that TQM is a good idea. The methods and effectiveness of implementing TQM, however, did vary substantially between companies over the three years. Some firms completely abandoned their TQM implementations while others achieved award-winning results.
publisherAmerican Society of Civil Engineers
titleTotal Quality Management Implementations and Results: Progress Update
typeJournal Paper
journal volume3
journal issue1
journal titlePractice Periodical on Structural Design and Construction
identifier doi10.1061/(ASCE)1084-0680(1998)3:1(34)
treePractice Periodical on Structural Design and Construction:;1998:;Volume ( 003 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record