Show simple item record

contributor authorAyman Abu Hammad
contributor authorMakarand Hastak
contributor authorMatt Syal
date accessioned2017-05-08T21:22:06Z
date available2017-05-08T21:22:06Z
date copyrightDecember 2004
date issued2004
identifier other%28asce%291076-0431%282004%2910%3A4%28136%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/48702
description abstractThis paper illustrates the production process of a manufactured housing factory and potential bottlenecks that could affect the system efficiency. To investigate ways for improving the performance of the U-shaped flow pattern layouts, a comparative study between two case study factories was conducted to realize their relative efficiencies and drawbacks. Process maps were prepared to establish the subactivity relationship at every assembly and subassembly station. Time data were collected for the station process time and the subactivity process time at the two factories to realize a generic (streamlined) system. The efficient criteria of the two systems were joined to develop a streamlined generic system.
publisherAmerican Society of Civil Engineers
titleComparative Study of Manufactured Housing Production Systems
typeJournal Paper
journal volume10
journal issue4
journal titleJournal of Architectural Engineering
identifier doi10.1061/(ASCE)1076-0431(2004)10:4(136)
treeJournal of Architectural Engineering:;2004:;Volume ( 010 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record