Show simple item record

contributor authorJim Smith
contributor authorPeter E. D. Love
date accessioned2017-05-08T21:22:04Z
date available2017-05-08T21:22:04Z
date copyrightMarch 2004
date issued2004
identifier other%28asce%291076-0431%282004%2910%3A1%2822%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/48683
description abstractThe project inception stage has been the focus of intense research activity for a number of years. The need to establish the project parameters and performance requirements has been an imperative in many organizations. Predesign processes and activities are being instituted that work through client strategic and organizational issues, needs, and requirements before the design team is involved. The participation of stakeholders in predesign workshops is a common feature of these project inception approaches. These approaches prepare a clear and workable statement of the project requirements in performance terms that the client group has agreed and committed itself to. This document can then provide a sound basis for the development of the design. One approach to these early stages of the project is
publisherAmerican Society of Civil Engineers
titleStakeholder Management during Project Inception: Strategic Needs Analysis
typeJournal Paper
journal volume10
journal issue1
journal titleJournal of Architectural Engineering
identifier doi10.1061/(ASCE)1076-0431(2004)10:1(22)
treeJournal of Architectural Engineering:;2004:;Volume ( 010 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record