contributor authorH. Randolph Thomas
contributor authorJohn I. Messner
date accessioned2017-05-08T21:20:30Z
date available2017-05-08T21:20:30Z
date copyrightOctober 2003
date issued2003
identifier other%28asce%291052-3928%282003%29129%3A4%28257%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/47668
description abstractIn recent years, there have been a number of construction disputes involving no-damages-for-delay clauses in construction contracts. This paper reviews the legal aspects of the no-damages-for-delay clause and presents in an easy-to-use flowchart the issues that need to be addressed to resolve disputes involving the no-damages-for-delay clause. Analysis shows that the clause presents a formidable obstacle for contractors to overcome if monetary damages are to be recovered. The contractor in most instances needs to show that the owner or the owner’s agent caused active hindrance or the owner demonstrated bad faith toward the contractor. The language of the clause is critical to determining the risk it conveys to the contractor. Examples of minimal, intermediate, and maximum risk language are given.
publisherAmerican Society of Civil Engineers
titleNo-Damages-for-Delay Clause: Evaluating Contract Delay Risk
typeJournal Paper
journal volume129
journal issue4
journal titleJournal of Professional Issues in Engineering Education and Practice
identifier doi10.1061/(ASCE)1052-3928(2003)129:4(257)
treeJournal of Professional Issues in Engineering Education and Practice:;2003:;Volume ( 129 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record