description abstractThis paper describes the collapse during construction of a precast concrete girder bridge crossing Highway 15, north of Montréal. The bearing conditions for the girders at the time of collapse are discussed. The tie rods that were used to restrain the movement of the girder top flanges were tested to determine their effective stiffness and strength. Rotational and sliding tests were also performed on the pot bearing units. These experimental results were used in an analytical study to confirm the sequence of collapse of the girders. Bracing requirements during construction for precast girder bridges supported on pot bearings are discussed.
publisherAmerican Society of Civil Engineers
titleCollapse during Construction of a Precast Girder Bridge
typeJournal Paper
journal volume20
journal issue2
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)0887-3828(2006)20:2(113)
treeJournal of Performance of Constructed Facilities:;2006:;Volume ( 020 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record