Show simple item record

contributor authorNasim Uddin
date accessioned2017-05-08T21:15:05Z
date available2017-05-08T21:15:05Z
date copyrightFebruary 2005
date issued2005
identifier other%28asce%290887-3828%282005%2919%3A1%2869%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/44363
description abstractThe case of a hydroelectric power project is presented to show how lack of understanding and poor filter design, along with insufficient control of construction quality, caused the failure of a dam. This paper summarizes the forensic investigations and attempts to explain the conditions that led to the formation of sinkholes on the embankment slope and the subsequent initiation of progressive failure of the embankment. The steps necessary to restart the power project, including the final remedial design, are then detailed. This paper also discusses how the functions of various engineering design components are integrated in the context of failure of the embankment. This case serves as a lesson for practicing engineers concerning the difficult technical, professional, and procedural issues that may arise during the design and construction of critical infrastructures.
publisherAmerican Society of Civil Engineers
titleLessons Learned: Failure of a Hydroelectric Power Project Dam
typeJournal Paper
journal volume19
journal issue1
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)0887-3828(2005)19:1(69)
treeJournal of Performance of Constructed Facilities:;2005:;Volume ( 019 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record