Show simple item record

contributor authorDonald O. Dusenberry
contributor authorMehdi S. Zarghamee
contributor authorAtis A. Liepins
contributor authorRene W. Luft
contributor authorFrank W. Kan
date accessioned2017-05-08T21:14:35Z
date available2017-05-08T21:14:35Z
date copyrightFebruary 1995
date issued1995
identifier other%28asce%290887-3828%281995%299%3A1%284%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/44044
description abstractIn November of 1990, approximately 850 m (2,800 ft) of the 2020 m (6,620 ft) long Lacey V. Murrow Bridge (LVMB), a 50-year-old floating concrete bridge over Lake Washington near Seattle, sank after a major storm. The bridge had been closed for renovations for several months when it sank; there were many structural changes and interim conditions which affected the performance of the bridge. The investigation described herein identifies the most probable causes of the failure. The primary cause of the sinking of the LVMB was water that accumulated in the bridge during renovation. Hydrodemolition, rain, and wave splash water entered through construction openings and severed roadway drains. The cause of the failure was unrelated to strength reductions caused by the openings, and the age and condition of the bridge were of minor significance.
publisherAmerican Society of Civil Engineers
titleFailure of Lacey V. Murrow Floating Bridge, Seattle, Washington
typeJournal Paper
journal volume9
journal issue1
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)0887-3828(1995)9:1(4)
treeJournal of Performance of Constructed Facilities:;1995:;Volume ( 009 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record