Show simple item record

contributor authorCurtis O. Sealy
contributor authorSamson W. Bandimere
date accessioned2017-05-08T21:14:13Z
date available2017-05-08T21:14:13Z
date copyrightMay 1987
date issued1987
identifier other%28asce%290887-3828%281987%291%3A2%2884%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/43826
description abstractSeveral methods of soil grouting and conventional underpinning are used to stabilize subsoils and repair the foundations of three apartment buildings. Innovative cold weather compaction grouting techniques were used in difficult soil conditions to densify poorly compacted man‐placed fill and soft organic silts beneath building foundations. Penetration grouting using a Portland cement slurry and Pozzolan (flyash) is performed to reduce permeability of the upper subsoils and to fill ineffective and detrimental building perimeter drains. A gravel intrusion jacking method is used to further density upper soils in conjunction with conventional underpinning methods. The project is unique because: (1) Techniques were used that allowed the contractor to drill and densify loose fills and soft natural soils containing cobbles and boulders; (2) the contractor was able to perform grouting and underpinning under extremely adverse weather conditions by using special equipment; and (3) occupants were able to remain in buildings during remedial construction.
publisherAmerican Society of Civil Engineers
titleGrouting in Difficult Soil and Weather Conditions
typeJournal Paper
journal volume1
journal issue2
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)0887-3828(1987)1:2(84)
treeJournal of Performance of Constructed Facilities:;1987:;Volume ( 001 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record