Show simple item record

contributor authorYangtian Yin
contributor authorMinhao Wu
contributor authorChau Le
contributor authorH. David Jeong
contributor authorKunhee Choi
date accessioned2025-08-17T23:00:11Z
date available2025-08-17T23:00:11Z
date copyright5/1/2025 12:00:00 AM
date issued2025
identifier otherJMENEA.MEENG-6410.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4307759
description abstractDespite extensive research to identify internal factors influencing highway infrastructure improvement projects’ contract time determination (CTD), definitive information regarding the comprehensive factors affecting urban highway rehabilitation projects remains lacking. The unique dynamics of urban environments require a more in-depth investigation. The primary objective of this study was to holistically examine the influential factors that affect CTD in the specific context of urban highway projects. An extensive survey was conducted involving 21 state transportation agencies (STAs) across 20 states. Rigorous statistical analyses, including descriptive statistics and analysis of variance (ANOVA) tests, revealed that traffic volumes play an instrumental role in urban CTD decision-making. This study yields the results of influential factors for CTD that STAs can use as benchmarks when developing construction documents, including plans for contracting and contract times, specifications, and engineer estimates, collectively known as the plan, specifications, and estimate (PS&E) bidding package. These results can assist STAs in devising more reliable PS&E documents, which are particularly useful for bidding under alternative contracting provisions such as cost-plus-time, where bidder selection is based on a combination of cost and contract time.
publisherAmerican Society of Civil Engineers
titleExamining Critical Factors Affecting Urban Highway Construction Contract Times
typeJournal Article
journal volume41
journal issue3
journal titleJournal of Management in Engineering
identifier doi10.1061/JMENEA.MEENG-6410
journal fristpage04025011-1
journal lastpage04025011-14
page14
treeJournal of Management in Engineering:;2025:;Volume ( 041 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record