Show simple item record

contributor authorQiangnan Cao
contributor authorXin Zou
contributor authorLihui Zhang
date accessioned2025-08-17T22:38:34Z
date available2025-08-17T22:38:34Z
date copyright7/1/2025 12:00:00 AM
date issued2025
identifier otherJCEMD4.COENG-15279.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4307234
description abstractScheduling repetitive construction projects (RCPs) is a challenging task due to the nature of the activities involved. It requires careful consideration of both flexibility and computational performance. This paper develops a versatile RCP scheduling framework applicable to multiple construction scenarios, providing greater flexibility than existing models. The framework incorporates various scheduling features for repetitive activities, such as soft logic, multiskilled crews, multimode execution, crew transfers, and continuous or noncontinuous execution. It also offers optional optimization objectives, such as minimizing the overall project duration, total cost, crew interruption time, and number of employed crews. Planners can combine the features of repetitive activities and choose one or more objectives to meet their needs and preferences. The proposed framework is based on constraint programming, which balances computational efficiency and solution quality while remaining user-friendly. The practicality and effectiveness of the framework are verified through three case studies involving five real-life projects. The results demonstrate that the proposed framework can produce RCP schedules with shorter duration, lower costs, or reduced resource utilization compared with those generated by existing models. Efficient scheduling is of great importance for the successful implementation of RCPs. However, it is also a highly challenging task, given that different types of RCPs correspond to different construction scenarios. This paper presents a novel RCP scheduling framework that facilitates the simulation of diverse construction scenarios by incorporating flexibility in the modeling of activities, crews, and objective functions. The framework incorporates multicrew operations for individual activities and facilitates alterations in the construction sequence of units. Moreover, the framework integrates multiskilled crews, offers a variety of execution modes, and supports both intermittent work and strict continuity, as required by the project. Additionally, it provides several objectives, including project duration, project cost, work continuity, total number of crews, or multiples of them. The framework is formulated using the constraint programming technique, which offers the advantages of easy construction, convenient use, and highly efficient solving. Finally, three case studies based on five real-life RCPs are conducted to verify the practicability and validity of the proposed framework. The results demonstrate that the framework outperforms existing models in terms of time, cost, and resource optimization.
publisherAmerican Society of Civil Engineers
titleA Flexible Scheduling Framework for Repetitive Construction Projects Based on Constraint Programming
typeJournal Article
journal volume151
journal issue7
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/JCEMD4.COENG-15279
journal fristpage04025073-1
journal lastpage04025073-14
page14
treeJournal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 007
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record