Show simple item record

contributor authorMarco Maio
contributor authorGustavo Marini
contributor authorFernando Zotti
contributor authorNicola Fontana
date accessioned2025-04-20T10:16:01Z
date available2025-04-20T10:16:01Z
date copyright8/28/2024 12:00:00 AM
date issued2024
identifier otherJWRMD5.WRENG-6495.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4304350
description abstractAlthough pressure regulation valves (PRVs) are commonly used for reducing leakage in water distribution networks (WDNs), in recent years, many studies have highlighted the opportunity of using pumps as turbines (PATs) so as to couple pressure reduction (and thus leakage reduction) with hydropower generation. Unlike in water transmission systems however, flow discharge in a WDN varies continuously, consequently requiring real-time control (RTC) of pressure. Nevertheless, RTC of a PAT in a WDN remains an open issue, due to the lack of information and knowledge about PAT operation in a real environment. Whereas previous experimental studies have described PAT installation with a frequency converter in which the power produced gets dissipated through electrical resistance, in the hydraulic regulation layout, impeller speed depends on the electrical grid. Consequently, this paper proposes a comprehensive algorithm to both control the pressure at the control node of a WDN and produce power through a PAT directly connected to the electrical grid. The operation of the prototype was considered under hydraulic regulation, demonstrated by several studies to represent the most effective trade-off between costs and benefits. Further testing by means of laboratory experiments designed to simulate the operation of a grid-connected PAT installed in a WDN effectively validated the robustness of the proposed method. The results proved the ability of the prototype and algorithm to couple hydropower generation with pressure control even when the flow varied suddenly.
publisherAmerican Society of Civil Engineers
titleDirect Grid Connection of a Prototype with Real-Time Control for Energy Recovery and Pressure Control in a Water Distribution Network through Hydraulic Regulation
typeJournal Article
journal volume150
journal issue11
journal titleJournal of Water Resources Planning and Management
identifier doi10.1061/JWRMD5.WRENG-6495
journal fristpage04024049-1
journal lastpage04024049-12
page12
treeJournal of Water Resources Planning and Management:;2024:;Volume ( 150 ):;issue: 011
contenttypeFulltext