Show simple item record

contributor authorRoy Dong Wang
contributor authorTarek Zayed
contributor authorAbdelrahman E. E. Eltoukhy
contributor authorHengqin Wu
date accessioned2024-12-24T10:20:40Z
date available2024-12-24T10:20:40Z
date copyright9/1/2024 12:00:00 AM
date issued2024
identifier otherJCEMD4.COENG-14200.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4298747
description abstractTower crane layout planning (TCLP) is key to ensure the safety and productivity of construction projects. Previous studies on TCLP mainly focused on the typical in situ construction method, however, overlooking modular integrated construction (MiC). This study aims to develop an integrated planning approach for optimizing the locations of tower cranes and trucks for MiC across the entire construction site. This approach consists of four objective components. First, identifying potential locations for cranes and trucks by adopting a gridding method and an intersection examination algorithm. Second, estimating the crane operation duration. Third, optimizing the crane and truck locations by developing an integer linear programming (ILP) model while considering various constraints, such as the demand fulfillment, the crane’s lifting capacity, and the multiple truck parking areas. Lastly, optimizing the distance between cranes to avoid crane blocking on site. The proposed approach is validated via three high-rise residential MiC projects. The results achieve 19.4%–37.9% reductions in cranes’ operation durations, as well as carbon emissions from the original plan. Compared with another existing TCLP method made from limited predefined layout plans, a 29.4% improvement is observed. Moreover, three aspects to extend the application of the approach are discussed: (1) the multiple tower crane layout scenario, (2) the impact of the number of truck points, and (3) the trade-offs between computing effectiveness and performance. The approach realizes the objective of TCLP decision-making for multi-crane multitruck MiC throughout the whole construction site. Construction practitioners can use this approach for decision-making which helps enhance the effectiveness of their tower crane layout designs.
publisherAmerican Society of Civil Engineers
titleIntegrated Planning Approach for Optimizing Tower Crane and Truck Locations in Modular Integrated Construction
typeJournal Article
journal volume150
journal issue9
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/JCEMD4.COENG-14200
journal fristpage04024121-1
journal lastpage04024121-23
page23
treeJournal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 009
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record