Show simple item record

contributor authorOmar Shabana
contributor authorGhada M. Gad
date accessioned2023-08-16T19:09:56Z
date available2023-08-16T19:09:56Z
date issued2023/08/01
identifier otherJLADAH.LADR-827.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4292860
description abstractAs the construction industry continues to lead the economic growth of many countries, alternative contracting methods have been increasing as a valuable tool to implement on projects. The public–private–partnership (P3) delivery method is becoming an increasingly popular delivery method for megaprojects due to its many advantages, such as private entity financing and the transfer of design, construction operations, and maintenance risks to a concessionaire. As more P3 transportation projects are being executed in the United States, researchers are considering how effectively contracts have been negotiated and drafted between owners and contractors to account for project risks and, consequently, reduce claims and disputes. The objective of this study was to (1) investigate how P3 transportation projects’ contracts are drafted to allocate risks, (2) identify the leading causes of claims and disputes on such projects, and (3) provide recommendations on how risks can be managed and allocated during the contract negotiation phase to reduce claims and disputes. To achieve these objectives, 10 case studies were conducted on 10 P3 transportation projects nationwide with a total cost of $11 billion. The case studies included both content analysis of bid and contract documents and follow-up interviews with project team members to identify risks that caused claims on the projects. The results showed that right of way (ROW) availability, utility relocations, staffing, governmental approvals, and differing site conditions were the leading causes of claims and disputes on the P3 transportation projects included in this case analysis. The results and recommendations can be used to mitigate the negative impact of such risks on future P3 transportation projects.
publisherAmerican Society of Civil Engineers
titleMitigating Claims and Disputes for Public–Private–Partnership Transportation Projects in the United States
typeJournal Article
journal volume15
journal issue3
journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
identifier doi10.1061/JLADAH.LADR-827
journal fristpage04523012-1
journal lastpage04523012-11
page11
treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2023:;Volume ( 015 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record