description abstractThis paper presents the development of a novel model for optimizing the planning of renovation work in leased buildings that utilize the integrated project delivery (IPD) method to maximize the income of leased units during renovation work. The present model is developed in two main phases: optimization and renovation planning. The model integrates a novel methodology that enables decision makers to select optimal crew deployment data and number of assigned crews for all renovation activities, identify an optimal unit renovation order of all leased units, generate feasible renovation schedules, and quantify and minimize total net renovation cost. A real-life case study of three renovation projects was analyzed to illustrate the use of the model and demonstrate its capabilities. The results of this analysis clearly illustrate the original contributions of the model to the body of knowledge and its novel capability in generating optimal renovation schedules for leased buildings that enable contractors to maximize their share of rewards under IPD projects while minimizing their total renovation cost.
publisherASCE
titleOptimal Planning of Renovation Work in Leased Buildings under Integrated Project Delivery Method
typeJournal Article
journal volume38
journal issue6
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0001082
journal fristpage04022056
journal lastpage04022056_14
page14
treeJournal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record